One week ago I was happy that I mostly passed the framing, plumbing and electrical rough-in inspections. Later that night, Easton wanted me to install the switches, outlets and light receptacles. Then we had light in the bathroom! Over the weekend I installed the Boca plates, the fire boards and also applied water-proofing to the baseplates. I emailed pictures of my work to the inspector and he gave me the go-ahead.
Next up is the shower inspection. The inspectors want to know that builders are not putting drywall under the tile in the shower, so I have to get another inspection after installing the backing board in the shower.
Last night I plumbed the drain into the shower. The drain placement wasn't perfect, so that required a bit of work (and frustration). This afternoon I put up the Hardi-backer underlayment boards in the shower, as well as one piece of drywall on the ceiling above the shower.
No, I didn't get the hard-backer for free. Honestly, I am not getting much for free at this point. But more on that later...
It is starting to look like a bathroom!